Project Details

The base case development scheme is envisaged to include the installation of a new platform (Pearl), laying of inter-platform pipeline (10” x 8km Pearl to RBDP-B) and modification of existing RBDP-B platform and Ruby Princess FPSO to facilitate for additional production. It is envisaged to be an unmanned Light Weight structure or drilling platform which would accommodate between 3 to 4 conductor slots. The platform shall be designed for burnt down concept and minimum facilities. A firewater ring main shall be provided for use during drilling. Pearl will be remotely controlled and monitored using a dedicated operating station which is connected to the existing control room on Ruby Princess FPSO or new FPSO.

During the Conceptual Engineering, other options of crude evacuation shall be studied in details prior to proceeding with Basic Engineering.

Client : PETRONAS CARIGALI VIETNAM LIMITED
Project Location : PC VIETNAM LIMITED is undertaking the development of Pearl field which is located approximately 8km east of Ruby Field and 160km offshore Vung Tau, SR Vietnam in Blocks 01 and 02, in water depth of about 49m.
Scope of work undertaken by MMC O&G :
Activities include:MMC O&G scopes of work are in 2 stages, namely:
Stage I : Conceptual Engineering
Stage II : Basic Engineering (including preparation of EPCIC packages)
Stage I : Conceptual engineering scope of work includes the following:
i) Process study for Pearl field, options for interconnecting pipelines and Host Tie-in development;
ii) Manning level, control and telecommunication study and,
iii) Feasibility study and selection for LWS, required facilities and Equipment layout and platform configuration.
Stage II : Basic Engineering scope of work includes the following:
(i) Define and finalise the size and selected development option(s) from Stage I and
(ii) Basic design work for Stage II will be categorised as follows :
·
Design Parameters and Environmental Data
·
Process and Safety Engineering
·
Mechanical Engineering
·
Instrumentation Control, Shutdown and Telecommunication Engineering
·
Electrical Engineering
·
Structural Engineering
·
Pipeline Engineering
Project Duration :
Stage I: Conceptual Engineering (04/04/06 – 26/05/06) = 19 WEEKS
Stage II: Basic Engineering (18/08/06 – 10/11/06) = 57 WEEKS
Weight : N/A
  • Client PETRONAS CARIGALI VIETNAM LIMITED
  • Project Location 8km east of Ruby Field and 160km offshore Vung Tau
  • Project Duration 76 Weeks