Project Details
Kinabalu field is located 55km west-northwest of Labuan and 27km southwest of Semarang field in water depth of 54m. Kinabalu field is being produced via the Kinabalu Complex which consists of KNDP-A and KNDW-D. KNDP-A is an unmanned platform consists of 20-slots drilling bay with topsides partial stabilization oil and gas processing facilities which was installed in 1998. While KNDW-D is a installed minimum facilities drilling wellhead platform and bridge linked to KNDP-A. FWS from production wells in KNDW-D are sent to KNDP-A and being processed together with FWS from production wells in KNDP-A before being exported to the PCSB Samarang-A Production Platform (“SMG-A”) via a 12″ crude and 14″ gas subsea pipeline. In order to maximize the field production and preventing continuous laring, overall topsides facilities are debottlenecked in this work. Figure 1: Current Kinabalu Complex Overall Block Flow Diagram Purpose of contract are:
|
- Client Dayang Enterprise Sdn Bhd
- Project Location Malaysia
- Project Duration 6 Months
- Project No. DYE-A-0076