Project Details

Project Scope: DD to IFC

Complete and detailed review of facilities to confirm and finalize the facilities scope of work. Modification expected:

  • Re-aero/replace aero bundle and potential upgrade of auxiliaries i.e. dry gas seals and coupling
  • Replace 4 nos of anti surge valves
  • Upgrade gas facilities processing systems i.e install inlet device for production separator and slug receiver and upgrade glycol dehydration (replace stripping column on glycol regeneration skid)
  • Condensate pumps gear box change out
  • Rearrange instruments to cater for restaged condition
  • Replace internal parts of the fire case PSV
Client : EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
Project Location : Lawit-A Complex is located 240km NE of Kerteh
Project Duration : N/A
Weight : N/A
Technical Description :
  • Lawit-A is a CPP to Bintang A/B satellite platforms
  • Reservoir pressure initially sufficient to free flow gas to shore
  • 2 compressor trains installed in 1999
  • Allows delivery up to design capacity of 700MCFD at 5,275kPa (765 psi) system pressure
  • Current system pressure is at 3,200 kPa (464 psi); Lowest system pressure with the existing compressor is 3,000 kPa (435 psi), limited by the aero-bundle design
  • New compressor bundle design is required for further system pressure reduction 1,500kpa (218 psi) to maximize gas production and recovery
  • Lawit-A compressor restage committed start-up date of 1 st Quarter 2010
  • Client EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
  • Project Location Lawit-A Complex is located 240km NE of Kerteh
  • Project Duration 6 Months