Project Details

MMCOG worked with Saipem Sapura Kencana for the Kasawari Gas Development Project entailing the main objectives of WHP ready for Rig (RFR ) as well as First Gas Date (FGD) within 15 to 33 months from effective date.

The Kasawari gas field was discovered in November 2011 within a water depth of approximately
108m at the center.

The Kasawari Field is located in Block SK316 within the Central Luconia Province (See Figure 1 below),
approximately 200km North of Bintulu, Sarawak – Malaysia. The Kasawari gas field was discovered
in November 2011 within a water depth of approximately 108m at the center.

Figure 1 Location of Kasawari Field

 

Figure 2 Overall Kasawari Gas Development Project

As shown in the figure 2 above, MMCOG’s role was to provide engineering design for the facilities of Kasawari which include:

  • Central Processing platform (CPP) – 8-legged
  • 9-slot Wellhead platform (WHP) – 4-legged
  • Flare structures – tripod
  • Bridges (CPP to WHP and CPP to Flare structure)
  • Client Saipem SapuraKencana
  • Project Location Malaysia
  • Project Duration 8 Months (project completion on Jan 2015)
  • Project No. SSK-A-2314