Monday, September 24, 2018      Login     Contact Us
 

News & Events

  • Kopi O' Session with Acting CEO

    MMCOG held a session promoting communication between employees and top management on the 7th September 2018. This is in part of MMCOG's movement to a solution providing mindset catering to demands seeking good team working and growth...
    2018-09-21 16:55
  • CEO Info Session & Raya 2018

    For 2018, in conjunction with celebrating Aidil Fitri, MMCOG aims to stabilize our presence, reinforcing present values while venturing into new opportunities with interested partners both locally and internationally...
    2018-08-13 18:09
  • MMCOG at MGA-MOGSC Industry Gala Dinner 2017

    This year the Malaysian Gas Association (MGA) & The Malaysian Oil & Gas Services Council (MOGSC) Industry Gala Dinner was held at the Grand Mahkota Ballroom of Istana Hotel Kuala Lumpur. The theme was A'la P. Ramlee and Saloma...
    2017-11-14 17:26
  • CEO TOWNHALL SESSION 2017

    The recent CEO Townhall Session for the year 2017 witnessed its first engagement between MMC Oil & Gas (MMCOG) staff with its newly appointed Chief Executive Officer, En. Rashid Bin Muhamad...............
    2017-08-24 11:06
  • MMCOG AT OIL & GAS ASIA (OGA) 2017

    The 16th Asian Oil, & Petrochemical Engineering Exhibition.
    2017-08-07 10:17

Our services

Last Updated: Friday, September 21, 2018 - 16:57


Detail Design Engineering Services Dulang EWAG Project

PETRONAS Carigali is undertaking an Enhanced Oil Recovery (EOR) Technology Pilot Testing Project named Field Trial of Super Surfactant and Polymer for Enhanced Water Alternate Gas (EWAG) project at Dulang Field.

The Field Trial is planned for 3Q 2018. A Field Trial is proposed to be carried out on the top deck of Dulang-D satellite platform, 7.4km away from main platform in order to support the well candidate selection.

The objective of the Field Trial are to validate super chemicals lab data: Surfactant Foam & Polymer performance, to acquire Field Trial results for full-field study and to obtain the operation knowhow on the surfactant and polymer.

The equipment and chemical tanks will be transferred to the top deck. The EWAG FACILITIES required for the Field Trial will be installed, commissioned & operated for the Field Trial includes all related equipment, piping & fittings, supports, equipment stools, cable trays. Upon completion of the Field Trial, the EWAG FACILITIES will be decommissioned & removed. Platform facilities removed prior to the start of the Field Trial shall be reinstated.

The engineering services will cover the equipment selection, transportation, installation, operation and reinstatement to the original condition. Completion of the Detailed Engineering Design of the EWAG FACILITIES shall include incorporation of VENDOR data and preparation of As-Built DRAWINGS and final documentation and other necessary engineering analysis, follow-on engineering from the completion of detailed engineering design until COMMISSIONING and completion of EWAG FACILITIES.