Monday, September 24, 2018      Login     Contact Us
 

News & Events

  • Kopi O' Session with Acting CEO

    MMCOG held a session promoting communication between employees and top management on the 7th September 2018. This is in part of MMCOG's movement to a solution providing mindset catering to demands seeking good team working and growth...
    2018-09-21 16:55
  • CEO Info Session & Raya 2018

    For 2018, in conjunction with celebrating Aidil Fitri, MMCOG aims to stabilize our presence, reinforcing present values while venturing into new opportunities with interested partners both locally and internationally...
    2018-08-13 18:09
  • MMCOG at MGA-MOGSC Industry Gala Dinner 2017

    This year the Malaysian Gas Association (MGA) & The Malaysian Oil & Gas Services Council (MOGSC) Industry Gala Dinner was held at the Grand Mahkota Ballroom of Istana Hotel Kuala Lumpur. The theme was A'la P. Ramlee and Saloma...
    2017-11-14 17:26
  • CEO TOWNHALL SESSION 2017

    The recent CEO Townhall Session for the year 2017 witnessed its first engagement between MMC Oil & Gas (MMCOG) staff with its newly appointed Chief Executive Officer, En. Rashid Bin Muhamad...............
    2017-08-24 11:06
  • MMCOG AT OIL & GAS ASIA (OGA) 2017

    The 16th Asian Oil, & Petrochemical Engineering Exhibition.
    2017-08-07 10:17

Our services

Last Updated: Friday, September 21, 2018 - 16:57


Detailed Engineering Design Services of Sump and Drain Modification for Sarawak operation (SKO) Pipeline Replacement and Facilities Rejuvenation

The SKO Pipeline Rejuvenation project involves major pipeline asset replacements and upgrades to existing pipeline facilities to enable proper mitigation/monitoring for internal corrosion arising predominantly from Microbial Influenced Corrosion (MIC) with the objective of safeguarding short term and long term oil and gas production as well as reduce the risk of pipeline failure to ALARP.

 

Baram Fields Pipeline network

SKO currently operates a total of 172 pipelines with estimated total length of 1477 Km. Most of the SKO pipelines are offshore pipelines except for the terminal pipelines with onshore sections.

Integral to the work scope, the key actions identified to reduce the Pipeline Asset Risk to ALARP are detailed in the table below:

Client

:Petronas Carigali Sdn Bhd
Project Location:Malaysia
Project Duration:7 Months (Completed on Apr 2015)
Project No.:PCSB-A-2347U