Saturday, August 18, 2018      Login     Contact Us
 

News & Events

  • CEO Info Session & Raya 2018

    For 2018, in conjunction with celebrating Aidil Fitri, MMCOG aims to stabilize our presence, reinforcing present values while venturing into new opportunities with interested partners both locally and internationally...
    2018-08-13 18:09
  • MMCOG at MGA-MOGSC Industry Gala Dinner 2017

    This year the Malaysian Gas Association (MGA) & The Malaysian Oil & Gas Services Council (MOGSC) Industry Gala Dinner was held at the Grand Mahkota Ballroom of Istana Hotel Kuala Lumpur. The theme was A'la P. Ramlee and Saloma...
    2017-11-14 17:26
  • CEO TOWNHALL SESSION 2017

    The recent CEO Townhall Session for the year 2017 witnessed its first engagement between MMC Oil & Gas (MMCOG) staff with its newly appointed Chief Executive Officer, En. Rashid Bin Muhamad...............
    2017-08-24 11:06
  • MMCOG AT OIL & GAS ASIA (OGA) 2017

    The 16th Asian Oil, & Petrochemical Engineering Exhibition.
    2017-08-07 10:17
  • Hjh. Sharifah Zaida Nurlisha – Winner TOP 50 Female Energy Player In Emerging Economies (ASIA)

    Hjh. Sharifah Zaida Nurlisha is the General Manager of projects in MMC Oil & Gas Engineering Sdn. Bhd. and also the first elected female President of the Malaysian Oil and Gas Services Council (MOGSC).
    2017-06-13 10:14

Our services

Last Updated: Monday, August 13, 2018 - 18:12


EPCIC of Wellhead Platform (WHP) for Ophir Development Project Topside & Substructure Engineering and Design Services

PETRONAS has awarded a Small Field Risk Service Contract (SFRSC) to Ophir Production Sdn Bhd (OPSB) for the development and production of petroleum from the Ophir field, located offshore Peninsular Malaysia. OPSB is a joint venture company between Octanex Pte Ltd, Scomi D&P Sdn Bhd and VESTIGO Petroleum Sdn Bhd.

The Ophir field is situated within the North eastern part of Block PM-315, offshore the Malaysian Peninsula about 210km Northeast of Kerteh in approximately 73m water depth. The development concept is shown in Figure 2 below. It is comprised: of a Wellhead Platform (WHP) an FPSO. Note: The FPSO and pipeline are to be supplied by others and shall not form part of this Invitation to Bid (ITB).

 

Client

:Muhibbah Engineering Malaysia Berhad
Project Location:Malaysia
Project Duration:4 months (Completed on Mar 2016)
Project No.:MEM-A-2547