Provision of FEED and EPCIC of Kasawari Gas Development Project

MMCOG worked with Saipem Sapura Kencana for the Kasawari Gas Development Project entailing the main objectives of WHP ready for Rig (RFR ) as well as First Gas Date (FGD) within 15 to 33 months from effective date.

The Kasawari gas field was discovered in November 2011 within a water depth of approximately
108m at the center.

The Kasawari Field is located in Block SK316 within the Central Luconia Province (See Figure 1 below),
approximately 200km North of Bintulu, Sarawak - Malaysia. The Kasawari gas field was discovered
in November 2011 within a water depth of approximately 108m at the center.

Figure 1 Location of Kasawari Field

 

Figure 2 Overall Kasawari Gas Development Project

As shown in the figure 2 above, MMCOG's role was to provide engineering design for the facilities of Kasawari which include:

  • Central Processing platform (CPP) – 8-legged
  • 9-slot Wellhead platform (WHP) – 4-legged
  • Flare structures – tripod
  • Bridges (CPP to WHP and CPP to Flare structure)

Client

:Saipem & Sapura Kencana
Project Location:Malaysia
Project Duration:8 Months (project completion on Jan 2015)
Project No.:SSK-A-2314