PROVISION OF FRONT END ENGINEERING DESIGN (FEED) AND ENGINEERING , PROCUREMENT CONSTRUCTION, INSTALLATION & COMMISSIONING (EPCIC) OF WELLHEAD PLATFORMS (WHP) FOR BOKOR PHASE 3 RE-DEVELOPMENT PROJECT , ENHANCED OIL RECOVERY CENTRE


Baram Delta (BDO) & North Sabah (NS) Enhanced Oil Recovery Centre (EORC) is an unincorporated joint venture established by PETRONAS Carigali and Sabah Shell Petroleum Company for the delivery of Enhanced Oil Recovery (EOR) field development projects under the BDO & NS EOR Petroleum Arrangement Contractor (PAC). EORC is conducting the tender on behalf of PETRONAS Carigali Sdn Bhd (hereinafter referred to as COMPANY) for Bokor Phase 3 Re-Development Project (hereinafter referred to as PROJECT) to develop additional reserves via EOR initiatives through a combination of infill drilling and Water Alternate Gas (iWAG). This includes infill drilling of 13 producer wells and 4 iWAG which are located within the Baram Delta in the South China Sea, about 45km North West of Lutong, Miri, Sarawak. Equity in the field is shared between COMPANY and Sarawak Shell Berhad (SSB), with COMPANY as the Operator.

Client

:Malaysia Marine Heavy Engineering
Project Location:Malaysia
Project Duration:3 months (Completed on Oct 2015)
Project No.:MMHE-A-2526