Monday, September 24, 2018      Login     Contact Us
 

News & Events

  • Kopi O' Session with Acting CEO

    MMCOG held a session promoting communication between employees and top management on the 7th September 2018. This is in part of MMCOG's movement to a solution providing mindset catering to demands seeking good team working and growth...
    2018-09-21 16:55
  • CEO Info Session & Raya 2018

    For 2018, in conjunction with celebrating Aidil Fitri, MMCOG aims to stabilize our presence, reinforcing present values while venturing into new opportunities with interested partners both locally and internationally...
    2018-08-13 18:09
  • MMCOG at MGA-MOGSC Industry Gala Dinner 2017

    This year the Malaysian Gas Association (MGA) & The Malaysian Oil & Gas Services Council (MOGSC) Industry Gala Dinner was held at the Grand Mahkota Ballroom of Istana Hotel Kuala Lumpur. The theme was A'la P. Ramlee and Saloma...
    2017-11-14 17:26
  • CEO TOWNHALL SESSION 2017

    The recent CEO Townhall Session for the year 2017 witnessed its first engagement between MMC Oil & Gas (MMCOG) staff with its newly appointed Chief Executive Officer, En. Rashid Bin Muhamad...............
    2017-08-24 11:06
  • MMCOG AT OIL & GAS ASIA (OGA) 2017

    The 16th Asian Oil, & Petrochemical Engineering Exhibition.
    2017-08-07 10:17

Our services

Last Updated: Friday, September 21, 2018 - 16:57


Latest Projects

You don't have Javascript enabled. Hover for more information! But don't worry: you can still use this web site! You have two options:
  • enable Javascript in your browser and then refresh this page, for a much enhanced experience.
  • click the Update button every time you want to update the selection.

Provision of Onshore Conceptual Engineering Design for Angsi Chemical Enhanced Oil Recovery (CEOR) Project

MMCOG had successfully completed the Provision of Onshore Conceptual Engineering Design for Angsi Chemical Enhanced Oil Recovery (CEOR) Project.The scope consists of developing and optimizing Piping...

Front End Engineering & Design for Block SK311 South Acis Non Associated Gas (NAG) Development

MMCOG have successfully completed the Front End Engineering & Design for Block SK311 South Acis Non Associated Gas (NAG) Development.

Tapis D Detailed Design and Post-IFC Support for EOR Project

MMCOG have successfully completed the Tapis D Detailed Design and Post-IFC Support for EOR Project, operated by Exxonmobil Exploration and Prouction Malaysia Inc.

EPCC of Belum Satellite Topsides Facilities

Belum field (Block SK-309), at approximately 27 metres water depth, is located approximately 7 km & 48 km from Serendah (SN-PA) and Bintulu respectively, Sarawak in East Malaysia. Belum field has...

Front End Engineering & Design for Block SK311 Wangsa Field Substructure and Topside Project

MMCOG completed their 5 months project for Murphy; Front End Engineering & Design for their Wangsa Field Substructure and Topside which are separated into two phases:Phase 1: Concept...